Time : 2026-02-12
For the approval of each project, we will make every effort to assist our clients. The approval process for this project took as long as six months. Thanks to the joint efforts of the clients and the sales staff, the project was finally successfully launched.
On May 1st, 2025, we received the customer's inquiry. After learning about the customer's requirements for the building, we created a 3D model diagram to confirm the design with the customer first. After communicating all the quotation conditions, we finally provided the quotation.


After receiving the quotation, the client began to handle the import construction approval procedures. We maintained constant communication with the client and promptly provided all the required documents to them. The client also actively informed us of the progress of the approval process.




During the progress, the client sent us the local requirements for the material. After receiving the document, we immediately confirmed with the production department and the engineering department, informing the client that we could meet their requirements and even that the material strength was higher. We provided our material report for the client to check and informed the client that for each batch of materials, we would provide a material inspection report to ensure quality and safety.



In November, we received the latest feedback on the project. The project approval has been granted, and the client has provided the final dimensions and design drawings. We provided an accurate quotation after confirming all the information as per the client's requirements.


After receiving the quotation, the customer began the payment process, after receiving the deposit for the construction, we prepared the construction drawings and calculation book for the client for their confirmation. Currently, the project has begun production.