News

Home / News / Cheers to 2025 & 2026 – With Gratitude, Toward a Brighter Future!

Cheers to 2025 & 2026 – With Gratitude, Toward a Brighter Future!

Time : 2026-02-17

2025: You Made It Remarkable

To our long-term partners: Ten years of repeat orders—from industrial plants to logistics parks—your loyalty is our toughest "quality certificate".

To our new clients: Your trust sent "Made by Jinggang" across the sea.

To every inquirer: 2,000+ technical questions from 58 countries. Even before a deal is signed, every click pushes us to perfection.


2026: Better Service, Better Quality

We will keep raising the bar—better service, better quality—and we look forward to more handshakes, more shared success.


A Toast to All of You

Cheers to 2025 and the coming 2026!

Cheers to the journey behind and the adventure ahead!

May every valued customer enjoy a more successful future—together with Jinggang Building!


2026: we keep turning steel into reliability and partnerships into poetry.


—The entire Jinggang Building team

Cheers to 2025 


Prev

Riding into the Year of the Horse with Renewed Vigor and Commitment

Next

Argentine Warehouse Project

Latest news

How Can Buyers Verify Steel Fabrication Tolerances?

How Can Buyers Verify Steel Fabrication Tolerances?

Buyers can verify steel fabrication tolerances by comparing measured component dimensions, hole locations, member straightness, squareness, and connection geometry against the approved drawings and the tolerances specified in the project documents.

Read More
What Should Steel Structure Welding Inspection Cover?

What Should Steel Structure Welding Inspection Cover?

​Steel structure welding inspection should cover material identification, joint preparation, welding procedure compliance, welder qualifications, weld appearance and dimensions, required nondestructive testing, defect repair, and final documentation.

Read More
How Should Steel Column Base Plates Be Leveled?

How Should Steel Column Base Plates Be Leveled?

​Steel column base plates should be leveled and positioned according to the approved structural drawings, anchor-bolt layout, specified elevation, and erection tolerances before the column connection is finalized.

Read More