Steel Structure Warehouse

Home / Products / Steel Structure Warehouse / Frame Steel Structure Multi Storey Pre Engineered Steel Buildings
Multi Storey Steel Structure Industrial Warehouse
Multi Storey Steel Structure Industrial Warehouse
Multi Storey Steel Structure Industrial Warehouse
Multi Storey Steel Structure Industrial Warehouse
Multi Storey Steel Structure Industrial Warehouse
Multi Storey Steel Structure Industrial Warehouse

Frame Steel Structure Multi Storey Pre Engineered Steel Buildings

Get a Quote
Multi Storey Steel Structure Industrial Warehouse
Multi Storey Steel Structure Industrial Warehouse
Multi Storey Steel Structure Industrial Warehouse
Multi Storey Steel Structure Industrial Warehouse
Multi Storey Steel Structure Industrial Warehouse
Multi Storey Steel Structure Industrial Warehouse

Product Details

When land is your constraint, build vertically. Jinggang Building engineers and manufactures multi storey steel structure industrial warehouses from 2 to 6 floors — pre-engineered, code-compliant, and shipped factory-direct as a complete numbered kit to your site.




Hotel Prefabricated Building European Kit Prefab School Prefabricated Classrooms Steel Structure Multi Storey

Structure Frame System (Building Skeleten)

Choose Your Storey Count

From compact two-storey workshop-and-office buildings to six-floor high-bay logistics towers — our engineering team configures the right structural system for your operational brief and local code environment.


2-Storey:Workshop & Office Split

The most common entry-level configuration. Production or warehouse floor below; offices, QC labs, or staff amenities above. Clean separation of operations and administration without a large footprint.


Ground: clear-span production or storage

Upper: offices, control room, canteen

Stair + lift shaft provisions included

Total height typically 8–14 m

Floor live load: 5–15 kN/m² per level


3-Storey:Mid-Rise Industrial Warehouse

Three fully usable industrial levels for high-density storage, e-commerce fulfillment, or bonded warehousing. Intermediate mezzanine pick levels and conveyor provisions integrate into the primary frame from day one.


Each floor height: 4–6 m per storey

Floor: steel deck + RC composite slab

Goods lift / freight elevator provisions

Total height typically 14–22 m

Column grid: 6–18 m clear span


4 to 6-Storey:High-Rise Logistics Tower

Maximum land utilization for automated high-bay storage, urban e-commerce hubs, or multi-tenant industrial parks. Four to six storeys of pure industrial floor space on a compact footprint — with AS/RS, AGV, and conveyor provisions engineered in.


Structural system: moment-resisting frame

Floor live load: up to 20 kN/m² per level

AS/RS and AGV structural integration

Fire-rated cladding + escape stair design

Total height up to 40+ m



Hotel Prefabricated Building European Kit Prefab School Prefabricated Classrooms Steel Structure Multi StoreyHotel Prefabricated Building European Kit Prefab School Prefabricated Classrooms Steel Structure Multi Storey

Excellent Welding after Laser Cutting

Hotel Prefabricated Building European Kit Prefab School Prefabricated Classrooms Steel Structure Multi Storey
Hotel Prefabricated Building European Kit Prefab School Prefabricated Classrooms Steel Structure Multi Storey Hotel Prefabricated Building European Kit Prefab School Prefabricated Classrooms Steel Structure Multi Storey

Various Metal Panel Types

Hotel Prefabricated Building European Kit Prefab School Prefabricated Classrooms Steel Structure Multi Storey

Insulation Material Options

Hotel Prefabricated Building European Kit Prefab School Prefabricated Classrooms Steel Structure Multi Storey

Fitting System & Accesories

Hotel Prefabricated Building European Kit Prefab School Prefabricated Classrooms Steel Structure Multi Storey

ADVANTAGES

1. Free design and architectural drawings provided;

2. Durability, easy maintenance, designed life span for 50 years;

3. Fast and easy assemble, online installation guidance provided;

4. Elaborate and strong design, high wind ressistance performance;

5. Thermal and noise insulation, water proof and fire prevention.


6 Engineering Reasons: Steel Wins Multi-Story

For multi storey industrial warehouse construction, pre-engineered steel outperforms reinforced concrete across six measurable dimensions that directly affect your project economics.


1. Maximises GFA on Constrained Sites

A 6-storey steel structure warehouse delivers 6× the gross floor area of a single-storey building on the same land parcel. In premium industrial zones where land costs $500–$2,000/m², a multi storey solution can recover its construction premium from land savings alone within 12–24 months of operation.

2. 40–60% Faster Structural Completion

Pre-engineered steel frames are bolted, not poured — eliminating formwork, curing delays, and floor-by-floor concrete sequencing. A 4-storey steel frame typically reaches structural topping-out 3–5 months ahead of an equivalent RC building, compressing your operational start date and reducing financing carrying costs.

3. Industrial-Grade Floor Live Loads

Our multi storey steel structure industrial warehouses are engineered for floor live loads up to 20 kN/m² per level — sufficient for heavy racking systems, pallet stackers, and industrial equipment across all floors simultaneously. Each floor is independently calculated for its specific operational load rather than applying a blanket conservative value throughout.

4. Seismic & Wind Code Compliance as Standard

Multi-storey structures experience significantly greater lateral forces than single-storey buildings — wind and seismic loads are amplified by height. Every project is structurally analyzed to your site-specific seismic design category and wind zone using either moment-resisting or concentrically braced frames, with full stamped documentation for local permit submission.

5. Future-Proof: Reconfigurable Across Decades

As your operations evolve over the building's 50-year design life, steel floors can be adapted without structural demolition: new floor penetrations added, loads upgraded within the original frame capacity, internal layouts reconfigured for different tenants or product lines. Concrete frames rarely offer this without costly structural intervention.

6. Lower Lifecycle Cost — Higher Residual Value

Steel structures are lighter than concrete, requiring less foundation material and excavation. At end of life, structural steel retains significant scrap and resale value — unlike concrete, which incurs demolition costs. Combined with a lower construction weight reducing foundation costs, total lifecycle cost (TCO) consistently undercuts concrete alternatives over 20–50 year horizons.

Technical parameters

Material List
SizeAccording to Customers' Need
Main Steel Structure Frame
ColumnQ355B(S355JR, ASTM572, SM490,) Welded or Hot-Roll H Section Steel
BeamQ355B(S355JR, ASTM572, SM490,) Welded or Hot-Roll H Section Steel
Secondary Steel Structure Frame
PurlinQ235B/Q355B, C and Z Type Steel
Knee BraceQ235B, Angle Steel
Tie TubeQ235B/Q355B, Circular Steel Pipe
BraceQ235B, Round Bar or Angle Steel
BracingQ235B, Angle Steel, Round Bar or Steel Pipe
Roof & Wall Material, Door, Window
Roof & WallMetal sheet(PE+Galvanized+Aluminium), Sandwich Panel, Glass wool
Door & WindowRolling Up/Shutter Door, Sandwich Panel Door, Stainless Steel Door,  Aluminium Window;



Quality Control

Hotel Prefabricated Building European Kit Prefab School Prefabricated Classrooms Steel Structure Multi StoreyHotel Prefabricated Building European Kit Prefab School Prefabricated Classrooms Steel Structure Multi StoreyHotel Prefabricated Building European Kit Prefab School Prefabricated Classrooms Steel Structure Multi Storey

Faq

Is your company a factory or trading company?

We are manufacturer with foreign trade department, so you can get competitive price as well as professional service.

What are your main products?

We provide steel structure warehouse, workshop, chicken house, prefab house, container house, garage, aircraft hangar, sandwich panels and other construction materials.

What’s the quality assurance you provide and how do you make quality control?

Quality-first is our core value. Jinggang quality assurance team and quality control team have developed a rigorous quality inspection system based on ISO9001. Testing Laboratory guarantees qualified raw materials and high-standard product.

Do you offer installation guidance on site?

Yes, we provide one-stop service of installation, supervision and training by extra. We can send our professional technical engineers to supervise overseas installation.

What should I provide to get a complete quotation?

Please provide information of building dimensions, insulation material, local wind speed and snow load. Then we can make careful design and give competitive quotation.

Qingdao Jinggang Building Co., Ltd.

Contact Us

Our friendly team would love to hear from you!

PHONE

+86 13375326675