Our Products
Product Details
When land is your constraint, build vertically. Jinggang Building engineers and manufactures multi storey steel structure industrial warehouses from 2 to 6 floors — pre-engineered, code-compliant, and shipped factory-direct as a complete numbered kit to your site.

Structure Frame System (Building Skeleten)
From compact two-storey workshop-and-office buildings to six-floor high-bay logistics towers — our engineering team configures the right structural system for your operational brief and local code environment.
2-Storey:Workshop & Office Split
The most common entry-level configuration. Production or warehouse floor below; offices, QC labs, or staff amenities above. Clean separation of operations and administration without a large footprint.
Ground: clear-span production or storage
Upper: offices, control room, canteen
Stair + lift shaft provisions included
Total height typically 8–14 m
Floor live load: 5–15 kN/m² per level
3-Storey:Mid-Rise Industrial Warehouse
Three fully usable industrial levels for high-density storage, e-commerce fulfillment, or bonded warehousing. Intermediate mezzanine pick levels and conveyor provisions integrate into the primary frame from day one.
Each floor height: 4–6 m per storey
Floor: steel deck + RC composite slab
Goods lift / freight elevator provisions
Total height typically 14–22 m
Column grid: 6–18 m clear span
4 to 6-Storey:High-Rise Logistics Tower
Maximum land utilization for automated high-bay storage, urban e-commerce hubs, or multi-tenant industrial parks. Four to six storeys of pure industrial floor space on a compact footprint — with AS/RS, AGV, and conveyor provisions engineered in.
Structural system: moment-resisting frame
Floor live load: up to 20 kN/m² per level
AS/RS and AGV structural integration
Fire-rated cladding + escape stair design
Total height up to 40+ m


Excellent Welding after Laser Cutting
Various Metal Panel Types

Insulation Material Options

Fitting System & Accesories

ADVANTAGES
1. Free design and architectural drawings provided;
2. Durability, easy maintenance, designed life span for 50 years;
3. Fast and easy assemble, online installation guidance provided;
4. Elaborate and strong design, high wind ressistance performance;
5. Thermal and noise insulation, water proof and fire prevention.
For multi storey industrial warehouse construction, pre-engineered steel outperforms reinforced concrete across six measurable dimensions that directly affect your project economics.
1. Maximises GFA on Constrained Sites
A 6-storey steel structure warehouse delivers 6× the gross floor area of a single-storey building on the same land parcel. In premium industrial zones where land costs $500–$2,000/m², a multi storey solution can recover its construction premium from land savings alone within 12–24 months of operation.
2. 40–60% Faster Structural Completion
Pre-engineered steel frames are bolted, not poured — eliminating formwork, curing delays, and floor-by-floor concrete sequencing. A 4-storey steel frame typically reaches structural topping-out 3–5 months ahead of an equivalent RC building, compressing your operational start date and reducing financing carrying costs.
3. Industrial-Grade Floor Live Loads
Our multi storey steel structure industrial warehouses are engineered for floor live loads up to 20 kN/m² per level — sufficient for heavy racking systems, pallet stackers, and industrial equipment across all floors simultaneously. Each floor is independently calculated for its specific operational load rather than applying a blanket conservative value throughout.
4. Seismic & Wind Code Compliance as Standard
Multi-storey structures experience significantly greater lateral forces than single-storey buildings — wind and seismic loads are amplified by height. Every project is structurally analyzed to your site-specific seismic design category and wind zone using either moment-resisting or concentrically braced frames, with full stamped documentation for local permit submission.
5. Future-Proof: Reconfigurable Across Decades
As your operations evolve over the building's 50-year design life, steel floors can be adapted without structural demolition: new floor penetrations added, loads upgraded within the original frame capacity, internal layouts reconfigured for different tenants or product lines. Concrete frames rarely offer this without costly structural intervention.
6. Lower Lifecycle Cost — Higher Residual Value
Steel structures are lighter than concrete, requiring less foundation material and excavation. At end of life, structural steel retains significant scrap and resale value — unlike concrete, which incurs demolition costs. Combined with a lower construction weight reducing foundation costs, total lifecycle cost (TCO) consistently undercuts concrete alternatives over 20–50 year horizons.
Technical parameters
| Material List | |
| Size | According to Customers' Need |
| Main Steel Structure Frame | |
| Column | Q355B(S355JR, ASTM572, SM490,) Welded or Hot-Roll H Section Steel |
| Beam | Q355B(S355JR, ASTM572, SM490,) Welded or Hot-Roll H Section Steel |
| Secondary Steel Structure Frame | |
| Purlin | Q235B/Q355B, C and Z Type Steel |
| Knee Brace | Q235B, Angle Steel |
| Tie Tube | Q235B/Q355B, Circular Steel Pipe |
| Brace | Q235B, Round Bar or Angle Steel |
| Bracing | Q235B, Angle Steel, Round Bar or Steel Pipe |
| Roof & Wall Material, Door, Window | |
| Roof & Wall | Metal sheet(PE+Galvanized+Aluminium), Sandwich Panel, Glass wool |
| Door & Window | Rolling Up/Shutter Door, Sandwich Panel Door, Stainless Steel Door, Aluminium Window; |
Other Steel Products
Quality Control



Faq
Is your company a factory or trading company?
We are manufacturer with foreign trade department, so you can get competitive price as well as professional service.
What are your main products?
We provide steel structure warehouse, workshop, chicken house, prefab house, container house, garage, aircraft hangar, sandwich panels and other construction materials.
What’s the quality assurance you provide and how do you make quality control?
Quality-first is our core value. Jinggang quality assurance team and quality control team have developed a rigorous quality inspection system based on ISO9001. Testing Laboratory guarantees qualified raw materials and high-standard product.
Do you offer installation guidance on site?
Yes, we provide one-stop service of installation, supervision and training by extra. We can send our professional technical engineers to supervise overseas installation.
What should I provide to get a complete quotation?
Please provide information of building dimensions, insulation material, local wind speed and snow load. Then we can make careful design and give competitive quotation.
Contact Us
Our friendly team would love to hear from you!
PHONE
+86 13375326675