Our Products
Product Details
A two-story steel structure warehouse – also described as a double-storey steel warehouse or a steel structure warehouse with mezzanine floor – is a prefabricated multi-level building solution that maximises usable space by building upward rather than outward. When land is limited, rental costs are high, or footprint expansion is not an option, a two-floor steel warehouse building allows you to effectively double your operational area on the same foundation footprint.
Qingdao Jinggang Building Co., Ltd. designs and manufactures complete prefabricated two-storey warehouse kits at our own factory in Qingdao, China. From the primary H-section steel frame to the mezzanine floor structure, staircase, handrails, roof, walls, and all connection hardware – everything is factory-fabricated, individually numbered, and shipped as a complete bolt-together kit ready for rapid on-site assembly.

A two-story steel structure warehouse is a prefabricated multi-level building in which the primary structural framework – steel columns, beams, and floor framing – supports both a ground-floor operational area and a full second-floor mezzanine level or enclosed upper storey.
The key concept is vertical space utilisation: instead of acquiring additional land or constructing a separate building, a two-storey warehouse converts the wasted overhead volume inside your existing or new structure into productive, load-bearing floor space. For businesses facing land scarcity, high property costs, or urban site restrictions, this approach delivers significantly more operational area per dollar of construction investment.
The mezzanine floor system – the intermediate structural floor between ground level and the roof – is the defining element of this building type. It can be designed as a full enclosed second storey (with walls, windows, and insulation for office or commercial use) or as an open steel platform (for storage, equipment access, or production staging). Both configurations are fully achievable within Jinggang's standard design capability.
1. Double Usable Floor Area on the Same Footprint
The most compelling benefit of a two-storey steel warehouse is the ratio of usable space to land consumption. A 1,000 m² footprint building with a full second-floor mezzanine delivers approximately 1,800–2,000 m² of total usable floor area – without acquiring additional land, without expanding site boundaries, and without a proportional increase in foundation cost.
2. Multi-Functional Floor Layout – Ground Floor + Upper Floor
The two-level structure enables mixed-use configurations that are impossible in a single-storey building. Common layouts include: ground floor for warehouse/logistics operations + upper floor for offices, meeting rooms, and staff facilities; ground floor for manufacturing/production + upper floor for parts storage and inventory management; ground floor for vehicle storage or equipment + upper floor for administrative functions.
3. Faster and More Economical than New Construction or Site Expansion
Building a prefabricated two-storey steel warehouse is substantially faster and cheaper than either constructing an entirely new adjacent building or undertaking a traditional concrete multi-storey construction. On-site work is purely bolt-together assembly – no on-site welding, no formwork, no extended concrete curing periods. A typical two-storey steel warehouse of 500–2,000 m² ground-floor area can be assembled and enclosed in 4–8 weeks from component delivery.
4. High Floor Load-Bearing Capacity – Heavy Storage and Equipment Compatible
The steel mezzanine floor system in a Jinggang two-storey warehouse is engineered to support industrial-grade floor loads. Standard designs accommodate floor live loads of 3.0–5.0 kN/m² (approximately 300–500 kg/m²), suitable for pallet racking systems, archive shelving, office equipment, and general industrial storage.
5. Bolt-Together Modular Assembly – Minimal Site Disruption
Every component of the two-storey steel warehouse system is factory-drilled and marked for field identification. Assembly proceeds by bolting numbered members together according to the installation drawing package – no field cutting, no on-site welding, no specialist heavy plant required beyond a basic mobile crane or forklift.
6. Expandable and Reconfigurable
The modular steel frame of a two-storey warehouse is inherently adaptable. Bays can be added longitudinally to increase ground-floor and mezzanine area simultaneously. The mezzanine floor system can be extended to cover additional areas of the ground floor as business grows. Internal partitioning on the second floor can be reconfigured. If operational requirements change fundamentally, the bolt-together structure can be partially or fully disassembled and reconfigured, protecting the capital investment in the building.
7. Seismic and Wind Resistance
Multi-storey steel structures are inherently well-suited to dynamic load environments. The steel frame system – with moment-resisting connections at beam-column joints and diagonal cross-bracing in both roof and wall planes – provides effective lateral stiffness against wind and seismic forces.
8. Durable, Low Maintenance, 50-Year Design Life
All primary and secondary steel frame members receive shot-blasting to Sa2.5 standard followed by two-coat protective paint application (primer + finish coat) before leaving the factory. With appropriate maintenance, a two-storey steel structure warehouse achieves a design service life of 50 years.
Structure Frame System (Building Skeleten)


1. Primary Structure (Core System)
● Steel columns + beams form the main frame from foundation to roof
● Carry all loads (floor loads, wind, seismic)
● Roof beams and columns create a portal frame, ensuring overall stability
2. Mezzanine Floor (Second Level)
● Primary girders + secondary beams form a grid (typically 1.2–2.0 m spacing)
● Supports the upper floor
● Can be full-floor or partial mezzanine
3. Floor Deck Options (3 Types)
● Steel deck + concrete topping (most common): high strength, suitable for forklifts
● Steel grating: non-slip, allows light/air flow, ideal for industrial platforms
● Chequer plate steel: smooth and clean, suitable for offices or light storage
4. Stairs & Safety
Standard steel staircase with anti-slip treads and handrails
Optional:
● Goods lift (VRC)
● Forklift safety gates
5. Secondary Structure & Cladding (Envelope)
C/Z purlins support roof and wall panels
Wall/roof materials:
● Single-skin steel sheet
● Rock wool sandwich panels (fire-resistant)
● PU sandwich panels (thermal insulation)
Excellent Welding after Laser Cutting
Various Metal Panel Types

Insulation Material Options

Fitting System & Accesories

ADVANTAGES
Free design and architectural drawings provided;
Durability, easy maintenance, designed life span for 50 years;
Fast and easy assemble, online installation guidance provided;
Elaborate and strong design, high wind ressistance performance;
Thermal and noise insulation, water proof and fire prevention.
Technical parameters
| Material List | |
| Size | According to Customers' Need |
| Main Steel Structure Frame | |
| Column | Q355B(S355JR, ASTM572, SM490,) Welded or Hot-Roll H Section Steel |
| Beam | Q355B(S355JR, ASTM572, SM490,) Welded or Hot-Roll H Section Steel |
| Secondary Steel Structure Frame | |
| Purlin | Q235B/Q355B, C and Z Type Steel |
| Knee Brace | Q235B, Angle Steel |
| Tie Tube | Q235B/Q355B, Circular Steel Pipe |
| Brace | Q235B, Round Bar or Angle Steel |
| Bracing | Q235B, Angle Steel, Round Bar or Steel Pipe |
| Roof & Wall Material, Door, Window | |
| Roof & Wall | Metal sheet(PE+Galvanized+Aluminium), Sandwich Panel, Glass wool |
| Door & Window | Rolling Up/Shutter Door, Sandwich Panel Door, Stainless Steel Door, Aluminium Window; |
1. Logistics & E-commerce Warehouses
● Ground floor: goods receiving, storage, forklift operations
● Upper floor: order picking, packing, returns, offices
● Goods moved via conveyors, chutes, or lifts
● Ideal for e-commerce and 3PL operations in limited space
2. Manufacturing Facilities
● Ground floor: production, machinery, cranes
● Upper floor: materials, WIP, finished goods, spare parts
● Reduces handling distance and improves efficiency
3. Warehouse + Showroom
● Ground floor: showroom, retail, or service area
● Upper floor: storage, offices, meeting rooms
● Keeps customer area separate from operations
4. Storage + Office Building
● Ground floor: storage, workshop, parking
● Upper floor: air-conditioned offices and staff areas
● Combines industrial + office functions in one building
5. Land-Saving Storage Solution
● Used in land-scarce or high-cost areas
● Increases capacity without expanding footprint
● Common in urban industrial zones and logistics parks
Other Steel Products
Quality Control



Faq
Is your company a factory or trading company?
We are manufacturer with foreign trade department, so you can get competitive price as well as professional service.
What are your main products?
We provide steel structure warehouse, workshop, chicken house, prefab house, container house, garage, aircraft hangar, sandwich panels and other construction materials.
What’s the quality assurance you provide and how do you make quality control?
Quality-first is our core value. Jinggang quality assurance team and quality control team have developed a rigorous quality inspection system based on ISO9001. Testing Laboratory guarantees qualified raw materials and high-standard product.
Do you offer installation guidance on site?
Yes, we provide one-stop service of installation, supervision and training by extra. We can send our professional technical engineers to supervise overseas installation.
What should I provide to get a complete quotation?
Please provide information of building dimensions, insulation material, local wind speed and snow load. Then we can make careful design and give competitive quotation.
Contact Us
Our friendly team would love to hear from you!
PHONE
+86 13375326675